portfolio

Aproveitamento Hidroeléctrico de Chiumbe-Dala

Hydroelectric project on the river Chiumbe consisting initially of three Francis turbines simple horizontal shaft type, planned to operate under a nearly constant gross head of 57.92 m, with a group of 5.0 MW along with two other groups of 2.5 MW each.

 
cliente client
ENE

local location
Lunda-Sul, Angola

projecto project
2003

construção construction
2009
Intervention areas
structures
electromechanical eng.
hydraulic eng.