portfolio

CREC

The Cabinda Outer Circular Highway (CREC) has a length of 16 km, with a possible extension of 12 km north to connect to the Caio intersection (Cabassango-Malongo Road), a future centre of the city.

It starts on the Cabinda-Yema Road, south of the São Pedro Market. Roughly at the km 4 mark a major route is proposed linking to the Port of Cabinda, designated as the VLPC, with a length of about 6 km. Three multi-level intersections and six single level intersections will be created to connect to the existing roads.


cliente client
INEA

location
Cabinda, Angola

Project

2012

phase

pre-design
soapro estudos e projectos
transport inf.