Estrada Cabinda-Yema

Connecting the cities of Cabinda and Yema, this 22 km long road (17 km in extra-urban areas and 5 km in urban areas) was constructed in 18 months.

Around 210 000 m3 of earth was excavated and nearly 30 000 tons of asphalt was used. This large-scale enterprise required technical solutions for levelling such as the use of soil cement to stabilize the pavement foundation in a total area of 126 000 m2.

The contract also included the construction of approximately 7730 ml of storm water drainage.

client
INEA

location
Cabinda, Angola

project

2007

construction

2008-2010

total length

22 km

velocidade de projecto design speed
90 km/h

volume terraplenagens earthworks
210 000 m3
soapro estudos e projectos
hydraulic eng.
transport inf.

soapro fiscalização

const. management
const. supervision