Reabilitação da rua entre a rotunda junto ao Restaurante “a Petisqueira” e o Pir (rua da missão)

The rehabilitation includes the urban landscaping of the street, with the delineation of carriageways and pavements, as well as the creation of new plumbing infrastructure, such as the water supply network, the stormwater drainage network and the domestic sewage network and new electrical and telecommunications infrastructures. In terms of the water courses, their layout will be made compatible with the macrodrainage project planned for Cabinda.

The aim is to transform this street into a pleasant area to stroll along the seafront, so the urban proposal contemplates the inclusion of roadways and parking zones with bituminous pavements, landscaped paths and a car park.

client
Mota-Engil Angola

location
Sumbe, Angola

project
2010-2012

construction
2012-2013

total length
2.5 km

design speed
40 km/h

cross section
1x2 – 10.40 